+91-8755475716 WhatsApp Us Send EnquiryIn Amritsar, most requests for antistatic flooring come from hospitals. Private hospitals and medical colleges building or upgrading operation theatres, ICUs and imaging suites often have a specification that calls for an antistatic or conductive floor. The other main users are server and equipment rooms in banks, telecom sites and offices, plus a smaller number of electronics service labs.
An OT floor has to do several jobs at once:
An antistatic epoxy or PU self levelling floor built over a copper grid and conductive primer meets all of these. It is laid as one continuous surface and coved at the walls, and once cured it is tested for resistance.
The hospital's biomedical or project engineer normally specifies whether the OT needs a conductive or static dissipative floor and what resistance range applies. We build to that specification and hand over test readings.
Rooms with CT, MRI support equipment, cath labs and ICU monitoring systems contain expensive electronics. Static control helps protect them, and a smooth jointless floor makes it easier to move beds and equipment. Note that MRI rooms have their own shielding and non-magnetic material requirements, so we coordinate with the equipment vendor for those spaces.
Bank data rooms, telecom equipment rooms and office server rooms use antistatic floors or antistatic coatings on the slab under raised access floors. Dry Punjab winters increase static problems, so these rooms benefit from permanent floor-based control rather than relying on humidity.
Most hospital jobs are in buildings that are already open. We:
The process covers slab preparation, the copper grid and earthing points, conductive primer, the antistatic finish, coving at the walls, earthing by your electrician and resistance testing.
Cold slabs in Amritsar's winter slow the curing of resin floors. Hospitals are usually heated, which helps, but new wings and unheated rooms may need temporary heating during installation. We check the temperature before starting so the floor cures properly and reaches the right resistance.
It depends on the hospital's specification and the equipment in use. Many Indian hospital specifications still call for it. Your project engineer or biomedical team should confirm.
A single operation theatre usually takes about a week, including preparation, installation, curing and testing. Coving and repairs can add time.
Yes, with the disinfectants commonly used in hospitals. Avoid waxes and polishes, which can affect the floor's electrical performance.