Phone: +91-8755475716
Free site visit anywhere in India. No obligation.
+91-8755475716 WhatsApp Us Send EnquiryWalk through a bicycle parts or auto component plant in Ludhiana's Focal Point, and you'll see the same kind of floor damage almost everywhere. Chips along forklift routes, cracks near presses, oil stains around machines and faded markings where tyres run. Many of these plants already tried epoxy coatings, and many found them too brittle for the conditions. EPU flooring, an epoxy-polyurethane hybrid, is tougher against exactly this kind of use.
Forklifts carrying bins of stamped parts, forgings or castings put a lot of stress on floors: wheel loads, turning scuffs, and the occasional dropped bin. Rigid epoxy cracks and chips under these impacts, and once a chip forms, wheels keep hitting its edge and it grows.
EPU combines epoxy's hardness with polyurethane's toughness. It absorbs more impact before chipping and resists abrasion from turning wheels. It's a floor that keeps looking decent in a working factory rather than just on handover day.
Machining areas have cutting oils, coolants and hydraulic fluid leaks. EPU resists these in normal use, and a smooth, sealed surface makes cleaning much faster than bare concrete. Where oil constantly pools under machines, drip trays still help keep the floor and workers safe.
Punjab winters slow resin curing a lot. A floor laid in cold conditions without precautions can stay soft and wear quickly. In December and January, we check slab temperature, warm and enclose areas where needed, and give forklifts access only after the floor has properly cured.
Floors near presses often have cracks that move with vibration. Before coating, we assess each crack. Stable cracks are filled with epoxy, and moving cracks get flexible fillers or isolation joints. Broken joint edges along forklift routes are rebuilt with epoxy mortar. This preparation matters as much as the coating itself.
| Floor | Chipping under impact | Cracking with vibration | Cost |
|---|---|---|---|
| Bare concrete | Dusting and wear | Cracks spread | Lowest |
| Standard epoxy | Chips easily | Cracks near presses | Low |
| EPU hybrid | Resists chipping | Better flexibility | Moderate |
| Heavy duty epoxy screed | Very tough | Rigid | Higher |
For the very heaviest impact zones, such as directly under forging hammers, a thick screed or steel plating may still be needed.
Usually after a few days, depending on temperature. In winter it takes longer, and we confirm the date.
Yes, by working bay by bay or line by line, with shutdowns only for the area being coated.
Yes. Walkways, forklift routes and work zones are usually marked as part of the job.
Call +91-8755475716 or fill in the form below to book a survey in Ludhiana. More details are on our EPU flooring page.
Share a few details and our team will call you back within 24 hours. Prefer to talk now? Call +91-8755475716.