Get Free Quote

Free site visit anywhere in India. No obligation.

+91-8755475716 WhatsApp Us Send Enquiry

Why Choose Kaizen?

  • 12+ Years Experience
  • 500+ Projects Delivered
  • Free Site Visit Pan India
  • Certified Applicators
  • Transparent Pricing
  • On-Time Completion

In a Noida electronics or consumer goods plant, the production floor usually gets the specialist system: ESD flooring for assembly, cleanroom finishes for sensitive areas. The rest of the building, including component stores, packing halls, dispatch areas and loading docks, often gets a basic epoxy coat. Those areas carry the heaviest traffic in the building, and basic epoxy wears, chips and yellows there first. EPU flooring, an epoxy-polyurethane hybrid, is a better fit for them.

Stores, packing and dispatch

These areas typically see:

  • constant pallet truck and forklift traffic
  • carton and pallet dragging
  • dropped reels, bins and packed goods
  • shift-change foot traffic
  • sunlight through dock doors

EPU is harder-wearing than a thin coating, resists chipping better than standard epoxy, and keeps its colour near sunny doors. Aisle markings, pallet zones and pedestrian routes stay clear for longer.

Loading docks

Docks on the south and west sides of Noida plants get afternoon sun for hours. Standard epoxy yellows and the markings fade. The dock area also sees the highest wheel loads as trucks are loaded. We usually specify EPU with a UV-stable, anti-slip topcoat for dock zones, and rebuild broken dock edges with epoxy mortar before coating.

Where EPU isn't the right choice

It's important to keep the right floor in the right room:

AreaRecommended floor
SMT and electronics assemblyESD flooring
Cleanrooms and labsPU self levelling
Canteen kitchensPU concrete
Stores, packing, dispatch, docksEPU hybrid
OfficesStandard coating, tiles or carpet

Mixing systems across a plant this way puts the budget where each floor needs it.

Transitions between systems

Where EPU in a store meets an ESD floor in production, the transition needs care. Different systems must be separated cleanly, the ESD area's boundary must be clear, and trolleys crossing the joint shouldn't chip either edge. We plan these lines with your layout.

New plants and fast-track schedules

Many Noida plants are new, and floors are often scheduled just before equipment arrives. We test slab moisture early. If slabs are too damp, a moisture-tolerant primer or barrier layer keeps the project on track without risking blistering.

Installation

The slab is ground and repaired, primed, and coated with the EPU body coat and topcoat. Line marking is added before handover. Areas can usually take foot traffic in about a day and forklifts after the specified cure time.

FAQs

Can EPU be used in the same building as ESD flooring?

Yes. We lay each system in its own zone and detail the transition between them.

Will EPU resist forklift tyre marks?

It resists marking better than standard epoxy. Regular scrubbing keeps it looking clean.

How long does a dispatch hall take?

It depends on size and repairs. We phase it so dispatch can continue.

Call +91-8755475716 or fill in the form below to book a survey in Noida. More details are on our EPU flooring page.

Get a Free Quote in Noida

Share a few details and our team will call you back within 24 hours. Prefer to talk now? Call +91-8755475716.