+91-8755475716 WhatsApp Us Send EnquiryBareilly sits in the middle of a big sugarcane and grain belt, and much of the industry around Parsakhera and CB Ganj is linked to that: agro processing, food packaging, cold chain and the warehouses that serve them. There is also a steady furniture and wood-working trade. These floors need to be washable, dust-free and able to handle trolleys. A polyurethane floor coating is a practical fit for most of them.
Dusting concrete. Older factory floors often have a weak top layer. Every pallet truck and broom stirs up fine dust that settles on packed goods. Coating the floor stops this at the source.
Sticky, stained areas. Molasses, jaggery and syrup leaks soak into bare concrete and never really clean out. They also make coating harder, so these patches have to be ground back to clean concrete first.
Damp slabs in the monsoon. Ground floors in low-lying plots can pull moisture up from below. If a coating is laid over a wet slab, it blisters within months. We measure moisture before quoting and, where needed, use a moisture-tolerant primer or suggest an epoxy cementitious base layer.
PU coating works well for:
It is not the right choice for areas with steam cleaning, very hot spills or steel-wheeled trolleys. Those need PU concrete at 6 to 9 mm. And if a dry warehouse only needs dust control, a concrete densifier may do the job for less money. We would rather point you to the cheaper option than put down a coating you don't need.
We start with a site visit. Our team checks the slab strength, moisture, cracks and old patch repairs, and asks about your cleaning routine and what spills on the floor. Based on that we suggest a system and give a written quote.
On the job, the floor is mechanically prepared, damaged areas are repaired, primer is applied, and then the PU coat goes down. In a running unit we phase the work so one section is closed at a time. The coated area can take foot traffic after about a day. Full chemical resistance takes around a week.
Sometimes. We test the moisture level first. If it is moderately high, a moisture-tolerant primer can work. If it is very wet, the source of the damp needs sorting out before any coating goes down.
A plain glossy coat can be slippery. For wet areas we add fine anti-slip aggregate, which keeps the floor easy to clean while giving good grip.
Yes. Smaller jobs are easier to schedule when combined with other work in the region, so tell us your timeline and we will plan around it.
Call +91-8755475716 or fill in the form below. For more on the system, see PU floor coating.
Share a few details and our team will call you back within 24 hours. Prefer to talk now? Call +91-8755475716.