Phone: +91-8755475716
Free site visit anywhere in India. No obligation.
+91-8755475716 WhatsApp Us Send EnquiryLudhiana's factories cover a very wide range. Hosiery and knitwear units sit a few streets away from bicycle part makers, auto component plants and dyeing houses along Tajpur Road. The floors in these places don't face the same conditions, so the right coating in one unit can be the wrong one in the next. Polyurethane coating is a good answer for a lot of them, but not all.
| Type of unit | What the floor faces | What we usually suggest |
|---|---|---|
| Hosiery and knitting halls | Lint, light trolleys, dust on fabric | PU coating in a light colour |
| Stitching and packing | Foot traffic, cartons, frequent sweeping | PU coating |
| Dyeing and processing | Hot water, dyes, alkalis, constant wet | PU concrete or chemical resistant system |
| Bicycle and auto parts | Oil, coolant, dropped parts, forklifts | PU coating or heavy duty epoxy |
| Warehouses and godowns | Pallet trucks, dust | PU coating or concrete densifier |
The dyeing houses deserve a special mention. Hot dye liquor and caustic washes will ruin a thin coating within months. We would steer you towards PU concrete or a chemical resistant floor there, even though it costs more upfront.
Lint and fibre stick to rough concrete and make sweeping slow. A smooth PU surface lets the whole floor be cleaned in a few minutes. Fabric stays cleaner, and a light grey or off-white floor makes stains and dropped needles easy to spot. PU also dampens noise and feels a little softer underfoot than hard epoxy, which workers standing at machines all day notice.
Ludhiana gets properly cold in December and January, with foggy mornings and cold slabs. Resin coatings need warmth to cure. Below about 10°C they cure slowly and can end up soft or with a white bloom on the surface. In winter we check slab temperature before starting, work during the warmer hours and, if needed, enclose and heat the area. It adds a little time, but it saves you a floor that never cures properly.
We begin with a visit to see the floor and ask about your process, machine layout and cleaning. Oil-soaked patches near machines are common in engineering units and have to be cut out, since coatings won't bond to them. Machine foundations and anchor bolts are marked so we coat carefully around them.
After grinding and repairs, we prime and apply the PU coat. We can phase the work around production lines. Foot traffic returns in about a day. Forklifts and full production usually follow within a few days, and we confirm this in writing.
We can coat around fixed machines, but the finish is better and lasts longer when machines are moved for the few days of work. Where moving isn't possible, we seal the edges around the machine bases carefully.
Not usually. Hot liquor and caustic chemicals need a thicker system such as PU concrete or a chemical resistant floor.
Usually after about three days, depending on temperature. In winter it can take longer.
Call +91-8755475716 or send photos on WhatsApp for a first opinion. Read more about PU floor coating.
Share a few details and our team will call you back within 24 hours. Prefer to talk now? Call +91-8755475716.