Uttarakhand's industrial estates at SIDCUL Haridwar, Pantnagar, Sitarganj, Kashipur and Selaqui host pharma, FMCG, auto component and food plants. Our base in Roorkee is close to several of them. Across the state, two flooring problems come up again and again: new slabs that need a floor before they have dried, and older ground floors that stay damp through a long monsoon. Epoxy cementitious flooring is often the right tool for both.

New plants in the SIDCUL estates

Plants in SIDCUL Haridwar and Pantnagar are often built quickly to meet production or licensing dates. Concrete slabs need weeks to dry before an epoxy or PU finish floor can safely go on them, and in the monsoon that period stretches further.

Many epoxy cementitious systems can go down on younger, damper concrete, within the limits the manufacturer sets. Once cured, they act as a temporary moisture barrier, and the finish floor can follow. This can bring floor completion forward and reduce the risk of blistering later.

Damp ground floors

In the Terai belt around Pantnagar and Sitarganj, groundwater is high. In the foothills around Dehradun and Haridwar, rain is heavy and long. Many older ground-floor slabs in these areas never really dry out. Coatings laid on them blister. Epoxy cementitious is much more tolerant of this moisture, either as the finished floor or as a base for a topcoat.

Where it works as the finished floor

  • utility rooms, plant rooms and engineering stores
  • non-GMP corridors and service areas in pharma plants
  • washing and moderately wet areas in food units
  • workshops and stores in auto component plants

It is grey, matt and hard wearing. For GMP production rooms and hygienic areas, it serves as the base under a PU self levelling floor.

Why being in Roorkee helps

Moisture-related floor jobs benefit from testing at the right times: once before quoting and again just before installation. Being based in Roorkee, we can visit SIDCUL Haridwar and Selaqui quickly, and plan trips to Pantnagar, Kashipur and Sitarganj efficiently.

Our process

  1. Slab moisture and strength testing
  2. Surface preparation by shot blasting or grinding
  3. Crack and joint repairs
  4. Application of the epoxy cementitious layer at the planned thickness
  5. Finish floor if specified, after the base has cured
  6. Handover with curing and use guidance

FAQs

Can it help a plant start production sooner?

Often, yes. By allowing the floor system to go down on younger slabs, it can shorten the wait before finish floors are laid. We check your slab and the product limits first.

Which estates do you cover?

SIDCUL Haridwar, Selaqui, Pantnagar, Kashipur, Sitarganj and nearby areas.

Can it be used in monsoon season?

Inside covered buildings, usually yes, as long as there is no standing water or active seepage.

Call +91-8755475716 or fill in the form below to discuss your plant. More details are on our epoxy cementitious flooring page.