Phone: +91-8755475716
Free site visit anywhere in India. No obligation.
+91-8755475716 WhatsApp Us Send EnquiryNew plants in Baddi, Barotiwala and Nalagarh are usually built against a deadline. Production has to start on a date agreed with customers or regulators, and the floor is one of the last jobs. The problem is that a new concrete slab needs weeks to cure and dry before an epoxy or PU self levelling floor can safely go on it. In the monsoon it can take much longer. Epoxy cementitious flooring is how many plants close that gap.
Epoxy cementitious is a three-component system: epoxy resin, a hardener and a cement-based powder. Once mixed and applied, it cures into a dense, hard layer that bonds strongly to concrete. Its cement content means it tolerates moisture in the slab far better than pure resin floors.
A normal resin floor on a slab that is still damp will blister, sometimes weeks after installation. In a GMP room, that means a failed floor and a repair shutdown. Many epoxy cementitious systems can be applied to concrete much sooner, within the limits the manufacturer sets, and they act as a temporary moisture barrier. Once they have cured, the PU or epoxy finish floor goes on top.
In practice this can bring floor completion forward by weeks. We test the slab, check the manufacturer's limits and tell you honestly whether it will work for your timeline.
In some areas of a plant, epoxy cementitious is good enough as the final floor:
It is grey, matt and hard wearing, and it's easy to clean. It doesn't have the smooth, coved cleanroom finish needed in production rooms, which should get a PU self levelling floor on top.
Baddi's heavy rain from July to September keeps slabs damp, especially on ground floors of plants built on filled land. Epoxy cementitious systems are one of the few options that can go down reliably in these conditions. We still check for standing water and active seepage, which have to be fixed first.
It depends on the product and conditions. Many systems allow application on concrete that is much younger than epoxy would tolerate. We check the manufacturer's data and test your slab.
Yes. It is used as a base layer. The GMP requirements are met by the finish floor laid on top.
The coving is usually formed in the finish system. The epoxy cementitious layer prepares the base beneath it.
Call +91-8755475716 or fill in the form below to discuss your project timeline. More details are on our epoxy cementitious flooring page.
Share a few details and our team will call you back within 24 hours. Prefer to talk now? Call +91-8755475716.