Hotels, guest houses and restaurants in Amritsar are busy almost all year, and closing floors for renovation means lost bookings. Strong-smelling solvent coatings make it even harder, because guests in nearby rooms complain. Our epoxy-PU hybrid WB, the water-based version of our EPU hybrid system, gives corridors, back-of-house areas and restaurants a durable, washable coating with low odour, so work can happen around guests.

Hotels and guest houses

Common areas we coat in Amritsar's hotels include:

  • guest corridors, done section by section at night
  • lobbies' back areas, stores and staff rooms
  • laundry and housekeeping rooms
  • terrace access corridors and service stairs

The water-based coating has far less smell than solvent-based products, so guests in nearby rooms are rarely disturbed. For hotel kitchens with hot water and oil, PU concrete is more suitable.

Restaurants and dhabas

Restaurant dining areas take heavy footfall and constant spills. A water-based hybrid finish resists food stains, is quick to mop, and can be applied after closing time. Busy restaurants near the old city can often reopen for light use the next day.

Amritsar's winter

Winter is the season to plan carefully for with water-based coatings. Cold air and cold slabs slow evaporation and curing a lot, and damp, foggy weather makes it worse. In December and January we:

  1. warm the room before and during application
  2. keep air moving with fans
  3. apply thinner coats and allow more time between them
  4. avoid coating unheated spaces on very cold days

With these precautions, the finish is just as good. It simply takes longer to reach full use.

How it compares with other systems

AreaRecommended system
Hotel corridors, dining areas, staff roomsEpoxy-PU hybrid WB
Hotel kitchensPU concrete
Basement parking and service rampsCar park flooring
Workshops or heavy trafficEPU hybrid

Preparation

Existing floors in hotels are often tiled, marble or old coatings. Well-bonded tiles and stone can be lightly ground and coated. Loose tiles and failed coatings are removed first. Grout lines are filled so they don't show through the finish.

A night-time corridor job

  • After 11 pm: close one corridor section and protect doors
  • Preparation: clean, lightly grind and repair
  • Priming and coating: with ventilation running
  • Morning: reopen with walkway protection if needed, and finish remaining coats the next night

FAQs

Will guests notice the smell?

Odour is low and clears quickly with ventilation. Most guests don't notice.

Can it be applied over marble?

Yes, if the marble is well bonded. It is lightly ground for adhesion first.

Is winter a bad time for this coating?

Not bad, but slower. We warm rooms and allow more drying time.

Call +91-8755475716 or fill in the form below to plan work in your hotel. More details are on our epoxy-PU hybrid flooring (WB) page.

Get a Free Quote in Amritsar Punjab

Share a few details and our team will call you back within 24 hours. Prefer to talk now? Call +91-8755475716.