Corporate offices and IT campuses in Noida are demanding clients when it comes to renovation. Work has to happen outside business hours, spaces must be usable the next morning, and facility teams increasingly ask for low-VOC materials, both for staff comfort and for green building ratings. Our epoxy-PU hybrid WB, the water-based version of our EPU hybrid, is designed for exactly these conditions.

Why low VOC matters in offices

VOCs are the solvents that evaporate from many coatings, creating the "new paint" smell. In closed, air-conditioned office floors, they linger, cause headaches and trigger complaints. Many corporate occupiers and building owners also pursue green building ratings, which give credit for using low-VOC materials indoors.

A water-based hybrid coating releases far fewer VOCs than solvent-based epoxy or PU. Facility teams can schedule work over a weekend or overnight without disrupting staff.

Where it works in Noida's commercial buildings

  • Pantries and cafeterias, with washable, stain-resistant floors
  • Corridors and service areas, handling trolleys and foot traffic
  • Support rooms such as UPS rooms, storerooms and mailrooms
  • Parking lift lobbies and service floors that need a cleaner finish
  • Break-out and training areas with a durable colour finish

For server rooms and assembly areas that need static control, an ESD floor is required instead.

What to expect from a water-based system

Thinner coats. The finish builds up over several coats. It's a coating, not a thick screed.

Airflow matters. Water has to evaporate for the coating to cure. Office HVAC should stay on, or we bring in fans. Humid monsoon weather slows drying.

Traffic limits. It handles foot traffic, office chairs and trolleys well. For forklifts and heavy impact, the solvent-free EPU hybrid is better.

Documentation for facility teams

Corporate projects often need paperwork. We can provide:

  1. product data sheets
  2. VOC information from the manufacturer, for green building submissions
  3. a method statement and work schedule
  4. handover notes on cleaning and maintenance

A weekend installation

  • Friday night: clear, clean and prepare, repair defects, prime
  • Saturday: apply coating coats with ventilation running
  • Sunday: allow curing, light inspection and touch-ups
  • Monday: space back in use, with heavy furniture moved in once full cure is reached

Exact times depend on area and conditions, and we confirm them in the method statement.

FAQs

Can you provide VOC data for our green building documentation?

Yes. We provide the manufacturer's product data, including VOC information.

Will staff notice any smell on Monday?

With ventilation over the weekend, odour is usually minimal or gone by Monday.

Can it be used on office walls too?

Yes. The water-based hybrid also works on walls in pantries and corridors for a washable finish.

Call +91-8755475716 or fill in the form below to plan work in your building. More details are on our epoxy-PU hybrid flooring (WB) page.

Get a Free Quote in Noida

Share a few details and our team will call you back within 24 hours. Prefer to talk now? Call +91-8755475716.