Warehouses and factories in Ghaziabad tend to show the same pattern of floor damage. First, the joints between slab panels start to chip. Forklifts bang across the gaps, the edges break away and the joint becomes a trench. Then the loading dock edges crumble where trucks and dock levellers hit them. After that, potholes appear along the busiest forklift routes. Each problem is cheap to fix early and expensive to fix late, which is why we encourage warehouse managers to repair joints as soon as they start breaking.

Joint repair: the most important job

A broken joint does more than look bad:

  • forklifts jolt across it, damaging wheels, bearings and loads
  • stacked pallets can shift or fall
  • the impact keeps breaking more concrete along the joint
  • dirt and water collect in the gap

Our joint repair process is straightforward. We saw-cut parallel lines either side of the damaged joint, break out the loose concrete, prime the exposed edges and rebuild them with epoxy mortar. The joint is then reformed and filled with a semi-rigid joint filler that supports the edges under wheels while allowing small slab movement.

Loading dock edges

Dock edges take impact from truck tailgates, dock leveller lips and pallet jacks. Damaged edges make levellers sit badly and create a trip and wheel hazard. We rebuild dock edges with high-strength epoxy mortar and, where damage keeps recurring, recommend steel edge angles anchored into the concrete.

Potholes in forklift aisles

Potholes are cut to a rectangular shape with vertical sides, cleaned and primed, then filled with epoxy mortar and finished flush with the surrounding floor. Square-edged patches last much longer than irregular patches that taper at the edges.

Cracks in factory floors

Factory floors near heavy machinery in Sahibabad and along Meerut Road often crack from vibration and heavy loads. Stable cracks are filled with low-viscosity epoxy. Moving cracks get a flexible repair. Wide or growing cracks should be checked by a structural engineer.

Why epoxy instead of cement mortar?

PointEpoxy mortarCement mortar patch
Bond to old concreteVery strongOften weak
Time to carry loadHours to about a dayDays to weeks
Resistance to oil and chemicalsGoodPoor
Thin edgesHolds wellTends to break off
Cost per bagHigherLower

Cement patches are cheaper, but in busy warehouses they often have to be redone repeatedly.

Keeping the warehouse moving

We repair joints and potholes in short sections, often overnight or between shifts. Fast-curing epoxy mortars mean forklifts can usually return within a day. Traffic is diverted around the repair with cones and barriers.

FAQs

How many joints can you repair in a night?

It depends on the damage and joint length. We assess this during the survey and plan a realistic nightly target.

Should we coat the floor after repairs?

Not necessarily. Many warehouses only need joint and pothole repairs plus a densifier. A coating is worth it if you also want colour, marking or easier cleaning.

How long do joint repairs last?

Properly rebuilt joints with the right filler last many years. The filler may need topping up as slabs continue to shrink slightly.

Call +91-8755475716 or send photos of damaged joints on WhatsApp. More details are on our damaged concrete repair epoxy page.

Get a Free Quote in Ghaziabad

Share a few details and our team will call you back within 24 hours. Prefer to talk now? Call +91-8755475716.