+91-8755475716 WhatsApp Us Send EnquiryIn a pharma plant, walls and ceilings are part of the controlled environment. They must be smooth, cleanable, non-shedding and free of gaps where particles and microbes can collect. Auditors check them closely, particularly corners, junctions and every place where a pipe, duct or fitting passes through. In Baddi's pharma plants, we coat walls and ceilings and form coves that join them seamlessly to the floor system.
In GMP rooms, coves are usually needed at:
A cove turns a hard corner into a smooth curve that can be wiped in a single pass. Floor-to-wall coves are formed in resin mortar and keyed into both surfaces. Wall-to-wall and wall-to-ceiling coves are formed with suitable coving profiles or resin fillets before coating.
We apply hard, non-shedding epoxy or PU coatings suited to the cleaning agents and disinfectants used in your plant. Ceilings in coated masonry rooms get a compatible coating system. The finish is smooth, light coloured and uniform, so any contamination is easy to see.
This is the detail that decides whether a room passes inspection. Every point where something passes through the wall or ceiling needs sealing:
We seal these with compatible sealants so the coated surface is continuous and there are no gaps.
Higher-classification cleanrooms often use modular panels. Many pharma rooms, such as secondary packing, some production areas, corridors, airlocks and QC labs, use coated masonry very successfully. Your cleanroom design specifies which applies. We work on the coated rooms and coordinate with panel installers where the two meet.
Baddi's long monsoon leaves plaster slow to dry, and HVAC start-up in a new plant can create condensation on cold walls. Coatings on damp plaster blister. We check moisture before coating each room and coordinate with the HVAC team so rooms are stable during application and curing.
For validation and change control, we can provide material data sheets and batch details. Work in running plants is planned for shutdowns, with rooms sealed off from clean areas and cleaned before handover.
Not always. It depends on the room classification and your plant's specification. Floor-to-wall coves are standard in most GMP areas.
Yes, after old paint and any soft layers are removed back to sound plaster, and moisture is checked.
Yes. Sealing all penetrations is part of the job.
Call +91-8755475716 or fill in the form below to plan your shutdown work. More details are on our wall coating and coving page.